Retractable driveway bollards projects for school
Pop Up Bollards Projects for JNAN DR RUN HIGH SCHOOL
Jinan DR RUN High School is a high-standard, high-quality model school built in accordance with provincial standardization school standards. The school is located at the intersection of Pushuiquan Road and Tourist Road in Lixia District. The surrounding environment is beautiful and the transportation is convenient. The school covers an area of 64,000 square meters and a building area of 45,000 square meters. The planned number of students is 2,700 (1,500 in high school, 272 in current, 1,200 in junior high school).
In 2019-06-10, we have finished the installation of the retractable driveway bollards at this school. There are 9pcs 273mm diameters bollards with LED light on top. It enhance the security level of the school and also make the front gate look nicer.
Retractable Driveway Bollards Installation in Longhua Yulong School
Longhua New District Yulong School is located in Yulong Road, the core area of Longhua Central Axis, adjacent to Tanglang Mountain Forest Park and Shenzhen North Railway Station.
In June, 2019, we have installed 4pcs retractable bollard post at the entrance. All of those 4pcs bollards are with LED on top. Besides the automatic bollards. There are fixed bollards stand by.
Pup Up Bollards Project at Dongfeng Nissan Cultural and Sports Certer
Dongfeng Nissan Cultural and Sports Center covers an area of 267,000 square meters. It is located at the intersection of Eastern Express Road and Songshan Lake Avenue in Liaobu Town, Dongguan City, Guangdong Province. It is built in NBA specifications and can accommodate 16,000 spectators. The basketball court's field equipment ranks in the top ten in China, and it can meet the requirements of international and domestic top basketball events and NBA games. It is known as the “CBA First Pavilion”.
In 2019-7-13,we have finished the installation of the bollards. At this project, our bollards are working together with car plate liscence recongition system. Once the car plate number is recognized, the bollards will drop down automatically to let the car passing through. Our bollards replace the parking boom barrier.There are total 10pcs working as one lane to the parking lot entrance.
in 2019-7-18, the relevant person in charge of this project has inspected and accept the bollards, and they are very satisfied with the retractable bollard post of our company.
Retractable driveway bollards at Pingshan Liulian Primary School
Founded in 1958, Pingshan New District Liulian Primary School is located at the foot of Maqi Mountain and the center of Pingshan Office. The school covers an area of 14,000 square meters and a building area of 8515 square meters. There are 26 teaching classes, 1,400 students and 70 professional teachers.
In 2019-7-28, we have installed the retractable driveway bollards at the side gate of the school. The removable bollards and automatic bollards combines together to guard the security of the gate.